Closed sampling system (closed-loop sampler) ASTM D1265 liquid and gas sampling system
Closed sampling system (closed-loop sampler) ASTM D1265 liquid and gas sampling system
Closed sampling system (closed-loop sampler) ASTM D1265 liquid and gas sampling system
Closed sampling system (closed-loop sampler) ASTM D1265 liquid and gas sampling system
Closed sampling system (closed-loop sampler) ASTM D1265 liquid and gas sampling system
Closed sampling system (closed-loop sampler) ASTM D1265 liquid and gas sampling system
Product details
Essential details
MOQ:1
Specification Number:HCYQ
Product Introduction

Product Description

This is a new non-leaking, pollution free sampler which is used for sampling for all kinds of toxic, corrosive, explosive and flammable samples under low pressure, high pressure or medium pressure from petrochemical process pipe.

We can also design and manufacture sealed sampling device to meet special technical and safety requirements.

 

Features

Sampling from devices or process lines

System purge

Easy operation with single handle

 

Product Detail

Materials304, 304SS, 316SS
Cylinder Assembly500 ml cylinder
Needle Valves
NPT Quick-connects 
Sampling Valve
 
 

Ball Valves: Seat and O-ring

Max. Working Pressure: 103 bar @ 20 centidegrees

Temperature Range: -18 to 232 centidegrees

Other AccessoriesMetal Hoses
Pressure Gauge
ConnectionsNPS 1/2 flange

 

Note: Products of other specifications are available upon request.

.png

 

Operation

 

1-    Preparation

 

Install the sample cylinder and connect the hose to bottom side of the cylinder. Open the needle valves at both ends of the cylinder.

01.jpg

2-    Sampling

 

Turn the handle to the “PROCESS” position, allowing the sample to flow continuously into and fill the cylinder. Hold for a period of time to ensure representative sampling.

 

02.jpg

3-    Off

 

Turn the handle to the “OFF” position. Close the needle valves at both ends of the cylinder.

03.jpg

 

4-    Depressurization/vent

Turn the handle to the “VENT” position, connecting the sampling line with the vent line to depressurize and discharge the residual sample.

04.jpg

 

5-    OFF

 

Turn the handle to the “OFF” position and disconnect the hose. Remove the cylinder and connect the hose to the top quick connect to complete the sampling process.


 

 

Company

Team&Conditions
Work With Us

Collections

Featured Products

All products

About

News
Shop